Kitchens & baths.

Kitchens and baths are where a house is judged every day. We run them as short, tightly sequenced jobs: cabinets ordered before demolition, tile on site before the plumber leaves.

Book a site walk
A finished kitchen with warm oak cabinets, a stone island and pendant lights over three stools.

At a glance

What to expect.

Duration
Kitchens 8–10 weeks · baths 5–7 weeksMeasured from the first day on site, after permits.
Crew
Two to four on site, one lead throughout
Permit path
Over the counter for like-for-like; plan check if walls or gas lines move
Warranty
Ask about workmanship and product coverage. The applicable terms and conditions belong in your written proposal.

Included

What's in the scope.

  • Layout and cabinet shop drawings before any demolition
  • Plumbing and electrical relocation to the new plan
  • Waterproofing to a sheet membrane in every wet area
  • Stone templating, tile, glass and appliance set
  • A seven-day settling check after handover

Sequence

How the weeks go.

  1. Design and ordering Three to five weeks. Everything on site before day one.
  2. Demolition Two to three days.
  3. Rough trades Week one to two.
  4. Drywall, tile, cabinets Weeks three to six.
  5. Stone, fixtures, paint Weeks seven to eight.
  6. Settling check Day seven after handover.

Related: Willow Glen, a kitchen rebuilt inside a 1926 craftsman

Walk the site with us.

Book a site walk
Start your build
Call (408) 555-0142 Start your build

Claim this website for $0.

We build it free. Plans from $99/month after launch, cancel anytime.