A new house on your own lot, designed with your architect or ours, framed by one crew that stays until the keys. Typical schedule: twenty-two to thirty weeks after permits.

Book a site walk
A finished two-storey white farmhouse at dusk on a San Jose lot, lights on.

At a glance

What to expect.

Duration
22–30 weeks on siteMeasured from the first day on site, after permits.
Crew
One superintendent, same framing crew throughout
Permit path
Full plan check, eight to twelve weeks; grading permit on sloped lots
Warranty
Ask about workmanship and product coverage. The applicable terms and conditions belong in your written proposal.

Included

What's in the scope.

  • Survey, soils report and a full architectural and structural set
  • Demolition of any existing structure and site grading
  • Foundation, framing, roof, exterior envelope and all trades
  • Weekly site walk with a written two-week look-ahead
  • Final inspection, certificate of occupancy and the warranty terms set out in your written proposal

Sequence

How the weeks go.

  1. Pre-construction Six to ten weeks. Design, engineering, permit submittal, a fixed schedule you can read.
  2. Site and foundation Weeks one to three. Stakes, excavation, stem walls and slab, plumbing stubbed up.
  3. Frame and dry in Weeks four to ten. Walls, trusses, sheathing, wrap, windows, underlayment.
  4. Exterior and rough trades Weeks eleven to sixteen. Roof, siding, electrical, plumbing, HVAC rough-in, insulation.
  5. Interior finish Weeks seventeen to twenty-four. Drywall, cabinets, tile, floors, paint, fixtures.
  6. Flatwork, landscape, keys Weeks twenty-five to twenty-six. Driveway, walkway, lawn, final inspection, keys.

Related: Almaden, a 2,900 sq ft new build in 26 weeks