Project · Cherry Chase, Sunnyvale
Cherry Chase panel upgrade
1958 ranch on a 100A Zinsco panel with no spare spaces. The owners were adding a heat pump and an induction range. We replaced the service with a 200A meter-main combo, re-fed the house, added surge protection and left four spare spaces for the EV that comes next.
Service100A → 200A
On site1 day
Start to final4 weeks
Circuits24
What was included
- Load calc covering heat pump, induction range and a future EV
- PG&E service application and meter release
- New 200A meter-main, 24-space, copper bus
- Grounding electrode system: two rods plus water bond
- Whole-home surge protective device
- Every breaker labeled by room after a trace
“The breaker directory alone was worth it. We finally know which switch does what.”
§ 02
See how the work progresses.
Eight stages from a similar job, start to finish. Concept imagery.
01 · Existing panel
02 · Protected
03 · Service disconnected
04 · Old panel out
05 · New panel set
06 · Circuits landed
07 · Testing
08 · Finished
§ 03
How it ran.
- Week 0
Site walk
Zinsco panel photographed, loads measured, scope written the same afternoon.
- Week 1–3
PG&E
Application filed day one; release came in week three.
- Install day
Power off 8–4
Old panel out, new combo set, grounding redone, generator on the fridge.
- Week 4
Final
City inspection passed first visit. Directory handed over.
Planning a panel upgrade?
Read the service page or book a walk. Every scope is written the same day.
§ 04
More projects.
Lighting · 3 layers · 3 daysBirdland kitchen lightingEight cans, three pendants, under-cabinet tape, two scenes.
EV · 48A · Half dayPonderosa EV chargerFull panel, no upgrade: load management did the job.
Outdoor · 14 fixtures · 2 daysHeritage District walkwayPath lights, an up-lit oak, a sunset timer.
Rewiring · 4 circuits · 2 daysLakewood laundry circuitsDryer, washer, lights and a GFCI, all new copper.