Services
Interior and exterior painting.
Interiors, exteriors, cabinets, decks and the color consult that goes with all of them. Days on site and what is included are below; the number comes after a walk-through, never before.
Interior painting
Walls, ceilings, trim and doors. Furniture moved, floors covered, rooms back by dinner.
2–5 days
02Exterior painting
Wash, scrape, sand, prime, caulk, two coats. Stucco, wood siding and Eichler panels.
4–9 days
03Cabinet refinishing
Doors off, sprayed in our shop, boxes sprayed on site. A factory finish, not a brushed one.
5–7 days
04Decks & fences
Pressure wash, brighten, sand, then a penetrating stain that soaks in instead of peeling off.
2–3 days
05Color consultation
Ninety minutes in your home with large drawdowns, in your light. Included with every interior job.
90 min
How we price
A walk-through, then a written scope.
Walk the roomsDay 0
Every surface measured, every crack noted, photos of the problem spots.
Written scope after the site visitDay 2
Rooms, surfaces, prep, coats, days on site. Color is not needed yet.
Color consultBefore the job
Drawdowns in your light, a written color schedule, a test wall on day two.
The job, then a walk-throughAs scheduled
Touch-ups in raking light, warranty issued, quarts left behind.