Service 02 · EV chargers
EV charger circuits
A Level 2 charger is a dedicated 40 to 60-amp circuit, a 6-gauge run to the garage and a permit. We install Tesla Wall Connectors, ChargePoint, Wallbox and Emporia units, or a NEMA 14-50 outlet if you want to keep your options open.
Who it is for
New EV owners, two-car households that need two chargers on one panel, and homes where the garage is on the far side of the house from the panel.
What is included
- Load check: will the charger fit on your panel without an upgrade?
- Dedicated 40, 50 or 60A breaker and 6 AWG copper run
- Hard-wired charger or NEMA 14-50 receptacle, GFCI-protected
- Load-management module when the panel is full (no upgrade needed)
- Permit, inspection and PG&E EV rate paperwork
- Conduit run in the garage, surface-mounted and straight
How the job runs.
Durations are typical for a Sunnyvale single-family home. Yours is confirmed on the site walk.
- Day 0
Site walk
We confirm the panel has room, measure the run and agree where the charger sits relative to your charge port.
- Week 1
Permit
Over-the-counter in Sunnyvale for most chargers. We pull it.
- Install day
Three to five hours
Breaker in, conduit run, charger mounted and commissioned on your phone before we leave.
- Week 2
Inspection
City final. We meet the inspector so you do not need to take the morning off.
Eight frames, one camera.
Eight stages from a typical job of this kind. Concept imagery.
01 · Empty wall
02 · Marked out
03 · Conduit route
04 · Box set
05 · Breaker landed
06 · Charger mounted
07 · Commissioned
08 · Finished
Questions we get on this job.
My panel is full. Do I need an upgrade first?
Not always. A load-management device can share an existing circuit with the dryer or range, or throttle the charger when the house is busy. We check this on the site walk before suggesting a panel.
Hard-wired or plug-in?
Hard-wired runs cooler at 48A and is required for most chargers above 40A. A 14-50 outlet is fine at 32A and lets you swap chargers later.
Can you run it to a detached garage?
Yes. That is a trench, conduit and a sub-panel. Add a week for the dig.
Book a site walk for EV charger circuits.
No cost, no obligation. We measure, you decide.
Other services.
Service 01Panel upgrades100A to 200A, FPE and Zinsco replacement, meter-main combos.
Service 03Lighting designRecessed, under-cabinet, pendants, dimming scenes. Layered, not just bright.
Service 04Rewiring and remodel circuitsKnob-and-tube and aluminum replaced, new circuits for kitchens, baths and ADUs.
Service 05Outdoor and landscape lightingPath, step and tree lights on low-voltage, plus hard-wired exterior circuits.