01 · Panel upgrades
100 A to 200 A, in a day.
The most common job we do in Sunnyvale. A new 200 A main panel, every circuit landed on a new breaker, grounding electrode system brought to current code, and the meter base replaced if PG&E asks for it. We handle the PG&E service-change request and the city permit; you handle nothing.

- On site
- 1 day
- Power off
- About 6 hours
- Permit
- City of Sunnyvale + PG&E
- Lead time
- 2–3 weeks (PG&E schedule)
- What's included
- Load calculation for the house as it is and as you plan it
- PG&E service-change application and both site visits
- 200 A main panel, new breakers, AFCI/GFCI where required
- Grounding rods, water-pipe bond, intersystem bonding bridge
- Printed panel schedule and labels on every breaker
- City final inspection, permit card emailed to you