A Level 2 charger on its own 60 A circuit, 6 AWG copper, hardwired or on a NEMA 14-50. Installed in a visit, permitted, inspected.
- Typical schedule
- 1 week
- Charge rate
- Up to 48 A · 11.5 kW
- Panel upgrade
- Only when the load calc says so
EV chargers
How we do it.
The charger is the easy part. The question is whether your panel can carry 48 A of continuous load on top of what it already does. We run the calculation on the site walk and give you a straight answer: yes, yes with load management, or a panel first.
Three ways to get there
- Dedicated 60 A circuit. The standard install. Breaker, conduit or NM-B to the garage, charger mounted at the right height for your cable reach.
- Load management. A charger that throttles when the oven and dryer are on. Lets a 100 A or 125 A panel charge a car overnight without an upgrade.
- Two cars, one circuit. Power-sharing chargers split 60 A between two vehicles. See the Lakewood case.
Chargers we install
Tesla Wall Connector, ChargePoint Home Flex, Wallbox, Emporia, Enphase. Hardwired where possible; a 14-50 receptacle with a GFCI breaker where you want portability. We register the charger with your utility rate plan on the day.
Permits
Sunnyvale issues EV charger permits fast, often same day online. We pull it, schedule the inspection and send you the signed card.
Also
The other four.
- 01Panel upgrades100 A to 200 A, Zinsco and Federal Pacific out, smart panels in.
- 03LightingRecessed, under-cabinet, landscape. Dimmed properly, Title 24 compliant.
- 04RewiringKnob-and-tube, aluminum branch wiring and 1960s Eichler conduit, done room by room.
- 05Backup powerBattery, generator inlet or both, with a transfer switch that just works.
Next: a site walk.
Forty minutes at your panel. We leave you a written scope, the permit path and a start date. Prices come after the walk, never before.
Or call (408) 555-0147 to confirm availability. Visits are by arrangement.