Projects · Evergreen

Evergreen exterior

Exterior renovation of a 1924 craftsman: porch rebuilt on new footings, siding repaired and repainted, windows replaced in the original openings, roof replaced, and the front path and planting redone.

12 weekson site
1,340 sq ft bungalowfloor area
A finished craftsman bungalow with a new porch, white siding, dark trim and a fresh front path.
After · concept imagery

Before & after

Same room,
before and after.

Drag the handle, or use the arrow keys.

A finished craftsman bungalow with a new porch, white siding, dark trim and a fresh front path. The same bungalow before the renovation: peeling paint, a sagging porch, overgrown shrubs and a cracked path.

The job

Scope, weeks,
materials.

Duration
12 weeks on site · 5 weeks of design and permit before that
Size
1,340 sq ft bungalow · porch rebuilt
Permit
City of San Jose, plan check (porch structure and windows)
Neighborhood
Evergreen, San Jose
Crew
Halden crew of four, one foreman
Warranty
Two-year workmanship, in writing

Materials

  • PorchNew concrete footings, Douglas-fir posts and beams
  • SidingOriginal redwood repaired, new fibre-cement where rotted
  • WindowsDouble-hung, wood interior, aluminum-clad exterior
  • RoofComposition shingle, new gutters and downspouts
  • PaintTwo coats, warm white body, charcoal trim
  • LandscapeNew path, drought-tolerant planting, drip irrigation

On site

Four weeks
from the log.

Mid-build frames from the daily photo log.

Evergreen exterior, protection and demo: Shrubs out, old porch down, dumpster on the drive.
Week 1Protection and demo. Shrubs out, old porch down, dumpster on the drive.
Evergreen exterior, porch framing: New footings poured, posts and beams up.
Week 3Porch framing. New footings poured, posts and beams up.
Evergreen exterior, siding and windows: Rotted boards replaced, windows set, house wrapped.
Week 6Siding and windows. Rotted boards replaced, windows set, house wrapped.
Evergreen exterior, final details: Second coat on, path poured, planting in.
Week 11Final details. Second coat on, path poured, planting in.

“People slow down when they drive past now. Twelve weeks, and it looks like it was always this way.”

Dana & LuisEvergreen

Like this one?
Walk us through yours.

(408) 555-0142 Site visit

Claim this website for $0.

We build it free. Plans from $59/month after launch, cancel anytime.

Sent to hello@obraup.com. No payment is taken.