Sample Premium website. Like this design?
HaldenBuilders
(408) 555-0142

Projects · Almaden

Almaden kitchen

Full kitchen remodel inside the existing walls: peninsula removed, a 9 ft island added, new cabinet run to the ceiling, and the window kept where it was so the view over the sink stays.

9 weekson site
210 sq ftfloor area
A finished kitchen with white-oak cabinets, a stone-topped island with three stools and two pendant lights.
After · concept imagery

Before & after

Same room,
before and after.

Drag the handle, or use the arrow keys.

A finished kitchen with white-oak cabinets, a stone-topped island with three stools and two pendant lights. The same kitchen before the remodel: honey-oak cabinets, a tiled peninsula, vinyl floor and a white fridge.

The job

Scope, weeks,
materials.

Duration
9 weeks on site · 4 weeks of design and selections before that
Size
210 sq ft · same footprint
Permit
City of San Jose, over the counter (electrical and plumbing)
Neighborhood
Almaden, San Jose
Crew
Halden crew of four, one foreman
Warranty
Two-year workmanship, in writing

Materials

  • CabinetsRift-sawn white oak, frameless, soft-close
  • CountersHoned quartzite, 3 cm, mitred waterfall on the island
  • FloorEngineered white oak, 7 in planks, matte finish
  • LightingTwo linen pendants over the island, recessed cans on dimmers
  • AppliancesPanel-ready fridge and dishwasher, 36 in range
  • BacksplashHand-glazed ceramic tile, stacked

On site

Four weeks
from the log.

Mid-build frames from the daily photo log.

Almaden kitchen, protection: Floors boarded, dust walls up, fridge moved to the garage.
Week 1Protection. Floors boarded, dust walls up, fridge moved to the garage.
Almaden kitchen, opened up: Peninsula and old cabinets out, walls to the studs.
Week 2Opened up. Peninsula and old cabinets out, walls to the studs.
Almaden kitchen, rough-ins: Island circuits, new sink line, hood duct through the attic.
Week 4Rough-ins. Island circuits, new sink line, hood duct through the attic.
Almaden kitchen, final details: Pendants hung, backsplash grouted, stools arrive.
Week 8Final details. Pendants hung, backsplash grouted, stools arrive.

“Nine weeks was the promise. Keys back on a Friday, week nine.”

Priya & TomAlmaden

Like this one?
Walk us through yours.

(408) 555-0142 Site visit

Claim this website for $0.

We build it free. Plans from $59/month after launch, cancel anytime.

Sent to hello@obraup.com. No payment is taken.